Production planning and resource control(PPS)
Link requirements, resources and dates in one system, so production runs end to end and stays visible. You avoid overloads, reduce set-up and downtime and improve utilisation of your production lines – controlled directly from the ERP.
fabular. process chain
Real timeOpen orders
128
Batches today
24
fabAI flagged batch L-2481: three days from best-before – FEFO suggestion created.
- Capacities and dates
- Detailed scheduling
- Shop floor feedback
Plan production, control it, deliver on time
Order and production planning
Generate production orders from requirements, bills of material, routings and resources – with automatic scheduling and a capacity check.
Capacity planning and detailed control
Use machines, work centres and employees efficiently – with a graphical planning board, prioritisation and alternative allocations.
Material planning and availability check
Automatic comparison of stock, reservations and production requirements – so material is on hand when it is needed.
Feedback and shop floor data collection
Report actual times, quantities, rejects and status from a mobile device or a fixed terminal – posted automatically and visible in the plan at once.
See it on a case of your own
Bring a process from your business. In thirty minutes we show how production planning handles it – and where the limits are.
